Longest Path vs Total Float ≤ 0: Understanding True Criticality
- Mehmet Durak
- 29 Kas
- 1 dakikada okunur
Critical path analysis is at the heart of planning — but not all planners fully understand the difference between Longest Path and Total Float ≤ 0 in Primavera P6.
Total Float ≤ 0
Shows activities with no float or negative float
Useful for identifying schedule compression
Helps locate contractual delivery pressure points
However, it can mislead when calendars vary or constraints distort float.
Longest Path
Tracks the actual driving sequence of activities leading to project completion
Ignores float distortions
More accurate for identifying true critical activities
Preferred by forensic schedulers and claims professionals
When to Use Each
Purpose | Best Method |
True critical path? | Longest Path |
Contractual float reporting? | Total Float ≤ 0 |
Delay analysis? | Longest Path + change tracking |
Executive reporting? | Longest Path |
Understanding this difference is essential for producing defensible, dispute-proof schedules.