Understanding % Complete in Primavera P6
A Practical Guide for Accurate Project Tracking In construction and infrastructure projects, keeping accurate track of progress is essential for making informed decisions, preventing delays, and maintaining control over cost and schedule. Primavera P6, one of the industry’s leading project management tools, offers multiple ways to measure progress through “% Complete” metrics, with the added value of expert consultancy ensuring that these tools are leveraged to maximise proje
5 dakikada okunur


Why Cross-Functional Teams Are the Key to Smooth Project Delivery
Construction projects involve dozens of disciplines — from architects and engineers to planners, subcontractors, and suppliers. When these teams operate in silos, delays, clashes, and miscommunication become inevitable. This is why cross-functional collaboration has become one of the most powerful tools for modern construction management. 1. Combining Expertise Improves Decision-Making When design, engineering, planning, and site teams collaborate from the start: Risks are i
1 dakikada okunur


Why Choosing the Right Project Life Cycle Determines Your Project’s Success
In construction project management, your chosen project life cycle sets the tone for your entire delivery strategy. While many teams instinctively default to a traditional approach, not every project benefits from the same methodology. Selecting the right life cycle can improve clarity, reduce risks, streamline collaboration, and ultimately save significant time and cost. This blog explores the three dominant project life cycle approaches — Predictive, Iterative, and Hybrid
2 dakikada okunur
Longest Path vs Total Float ≤ 0: Understanding True Criticality
Critical path analysis is at the heart of planning — but not all planners fully understand the difference between Longest Path and Total Float ≤ 0 in Primavera P6. Total Float ≤ 0 Shows activities with no float or negative float Useful for identifying schedule compression Helps locate contractual delivery pressure points However, it can mislead when calendars vary or constraints distort float. Longest Path Tracks the actual driving sequence of activities leading to project
1 dakikada okunur


Primavera P6 Tip: Exporting Your Schedule to Excel for Faster Reporting
Not everyone on a project team has access to Primavera P6 — but everyone needs visibility. Exporting schedules to Excel makes sharing, reviewing, and analysing data easier for clients, subcontractors, and internal teams. Why Export to Excel? Enhances accessibility Enables custom analysis Simplifies reporting workflows Helps track changes externally Allows integration with Power BI dashboards How to Export to Excel Go to File → Export Select Spreadsheet (XLSX) Choose your Layo
1 dakikada okunur